October 2008 
October 1: Tile being laid in the upstairs bathroom
October 1: Tile being laid in the upstairs bathroom
Viewed: 589 times.

Door into the playroom
Door into the playroom
Viewed: 458 times.

Wiring run down the left beam, from left to right, and drilled through, now hanging out the bottom -- for attaching a light fixture. Groove will be filled in and virtually invisible once done.
Wiring run down the left beam, from left to right, and drilled through, now hanging out the bottom -- for attaching a light fixture. Groove will be filled in and virtually invisible once done.
Viewed: 476 times.

Tile installation in downstairs bathroom
Tile installation in downstairs bathroom
Viewed: 459 times.

Further work on the masonry heater -- it'll be done tomorrow
Further work on the masonry heater -- it'll be done tomorrow
Viewed: 481 times.

Looking down at the masonry heater
Looking down at the masonry heater
Viewed: 468 times.

Closer view of wiring groove
Closer view of wiring groove
Viewed: 438 times.

Upstairs bathroom tile at the end of the day
Upstairs bathroom tile at the end of the day
Viewed: 456 times.

Door into the mead area installed
Door into the mead area installed
Viewed: 453 times.

Downstairs bathroom tile at the end of the day
Downstairs bathroom tile at the end of the day
Viewed: 461 times.

Problem can light installation on front porch fixed
Problem can light installation on front porch fixed
Viewed: 497 times.

Can light trims installed in ceiling
Can light trims installed in ceiling
Viewed: 483 times.

Wiring coming out of the beam
Wiring coming out of the beam
Viewed: 480 times.

Don took this pic -- sparks from the saw Gary was using to trim the extra metal from the bits that connect the blocks of stone
Don took this pic -- sparks from the saw Gary was using to trim the extra metal from the bits that connect the blocks of stone
Viewed: 437 times.

Another pic of Gary with saw
Another pic of Gary with saw
Viewed: 477 times.

Pretty edge added to top of stove
Pretty edge added to top of stove
Viewed: 510 times.

October 2: Upstairs bath with completed tile
October 2: Upstairs bath with completed tile
Viewed: 498 times.

Closer view of tile in tub area
Closer view of tile in tub area
Viewed: 461 times.

Downstairs bath with completed tile
Downstairs bath with completed tile
Viewed: 450 times.

Masonry heater progress, 11am
Masonry heater progress, 11am
Viewed: 473 times.

Side view
Side view
Viewed: 445 times.

Masonry heater, 3:30pm
Masonry heater, 3:30pm
Viewed: 443 times.

Chimney hardware
Chimney hardware
Viewed: 492 times.

Inside the bake oven
Inside the bake oven
Viewed: 442 times.

Decorative stones laid out for application
Decorative stones laid out for application
Viewed: 484 times.