February 2: Burning the palm fronds from last year to make ashes for Ash Wednesday
Viewed: 540 times.
|
February 6: House progress! The arrival view shows a new wood structure on top of the foundation walls...
Viewed: 479 times.
|
Floor joists!
Viewed: 510 times.
|
More joists
Viewed: 512 times.
|
Inside, looking east (cistern wall on the left)
Viewed: 463 times.
|
View toward the southeast. Unfortunately, we had a downpour last night and the drain was clogged, so we had about 2 1/2 inches of water on the floor
Viewed: 511 times.
|
Southeastern downstairs bedroom
Viewed: 497 times.
|
Main room downstairs
Viewed: 500 times.
|
Wall dividing off what will be the unfinished space
Viewed: 478 times.
|
Insert masonry heater here
Viewed: 466 times.
|
Floor joists and blue skies
Viewed: 488 times.
|
The stairs come down here, then turn left
Viewed: 479 times.
|
Don demonstrating window width (to the inside of the framing openings -- the plywood is just for extra shelter, not an indicator of window openings)
Viewed: 519 times.
|
Don squeegeeing up water
Viewed: 510 times.
|
Main room in the evening light
Viewed: 470 times.
|
View to the west (missing interior walls between the bedroom/bathroom/closet)
Viewed: 489 times.
|
Connor being excited about floor joists and walls
Viewed: 484 times.
|
February 8: More house progress. Southeast spare room, now with insulating walls inside the poured walls
Viewed: 461 times.
|
Wine cellar
Viewed: 490 times.
|
Main downstairs room, showing post and stairwell
Viewed: 488 times.
|
Looking up through the stairwell
Viewed: 473 times.
|
Subfloor
Viewed: 474 times.
|
Standing between dining room and great room
Viewed: 461 times.
|
View to the southwest from the dining room
Viewed: 475 times.
|
February 11: Latest progress: walls coming up on the main floor
Viewed: 520 times.
|